ccie4u.com ccie4u.com
Home Products Labs Scenarios Study Guides About Us
 
    



To assist you with your rack rental experience we have added a device to allow you to reboot all the routers and switches. The routers and switches are connected to a power distribution unit which allows you to power cycle a device if it is hung as well as power them all off or on.  Be sure to save your work frequently as routers may hang - just as in the real CCIE lab exam. To access the reboot device (power) from the ccie4u terminal server follow the set of instructions below:

From the terminal server type "power" to access the power distribution unit. Type in the username and password you were supplied.  Initially all devices connected to the unit will be off.  Use these procedures to turn them on.  Once you have finished your scheduled rack rental time please turn all the devices back off using these same procedures after you have cleared the configs (write erase) - use option 5 (off) versus 4 (on) for controlling all outlets. Note: Do not use "immediate on" - option 1 under the device manager or you will cause a power outage and will not be given a makeup timeslot.

ccie4u_term> power
Translating "power"
Trying power (1.1.1.1, 2065)... Open

User Name : ccie4u
Password : ****

American Power Conversion Web/SNMP Management Card AOS v3.0.3
(c) Copyright 2000 All Rights Reserved MasterSwitch APP v2.2.0
-------------- -----------------------------------------------------------------
Name : ccie4u.com Power Unit Date : 11/01/2003
C ontact : support@ccie4u.com Time : 07:37:11
Location : Rack #1 Up Time : 0 Days 0 Hours 01 Minutes
Status : P+ N+ A+ User : Device Manager

MasterSwitch : Serial Communication Established

------- Control Console --------- ----------------------------------------------

1- Device Manager
2- Network
3- System
4- Logout

?- Help, <ESC>- Main Menu, <ENTER>- Refresh, <CTRL-L>- Event Log
> 1

------- Device Manager --------------------------------------------------------

1- Line 33 - 34 OFF
2- Line 35 - 36 OFF
3- Line 37 - 38 OFF
4- Line 39 - 40 OFF
5- Line 41 - 42 OFF
6- Line 43 - 44 OFF
7- Line 45 - 48 Cats OFF
8- VPN, PIX, AT M OFF
9- ALL Accessible Outlets

<ESC>- Back, <ENTER>- Refresh

> 9
 

------- ALL Accessible Outlets --- -------------------------------------
Outlet Name               Pwr On Dly Pwr Off Dly  Reboot Dur.
----------------------------- ---------------------------------------------------
1: OFF  Line 33 - 34;      Immediate Immediate      05 Seconds
2: OFF  Line 35 - 36          Immediate Immediate      05 Seconds
3: OFF  Line 37 - 38          Immediate Immediate      05 Seco nds
4: OFF  Line 39 - 40          Immediate Immediate      05 Seconds
5: OFF  Line 41 - 42          Immediate Immediate      05 Seconds
6: OFF  Line 43 - 44          Immediate Immediate      05 Seconds
7: OFF  Line 45 - 48 Cats 30 Seconds 15 Seconds 05 Seconds
8: OFF  VPN, PIX, ATM 15 Seconds Immediate 10 Seconds

1- Immediate On
2- Immedi ate Off
3- Immediate Reboot
4- Delayed On
5- Delayed Off
6- Sequenced Reboot
7- Delayed Reboot
8- Delayed Sequenced Reboot
9- Cancel Pending Commands

?- Help, <ESC>- Back, <ENTER>- Refresh

> 4   (To turn all on - or 5 to turn all off)
------ -----------------------------------------------------------------

NO TE: Do not use "1" as it will pop the circuit breaker !!!!!!


Delayed On

Turn All outlets ON af ter power on delay.

Enter 'YES' to continue or <ENTER> to cancel : YES
Command successfully issue d.

Press <ENTER> to continue...

------- ALL Accessible Outlets ----------------------------------------- -------
Outlet Name Pwr On Dly Pwr Off Dly Reboot Dur.
----------------------------------------------------------- ------------
1: ON Router 1 Immediate Immediate 05 Seconds
2: ON Router 2 Immediate Immediate 05 Seconds
3: ON Router 3 Immediate Immediate 05 Seconds
4: ON Router 4 Immediate Immediate 05 Seconds
5: ON Router 5 Immediate Imm ediate 05 Seconds
6: ON Router 6 Immediate Immediate 05 Seconds
7: ON Router 7 Immediate Immediate 05 Seconds
8 : ON Router 8 Immediate Immediate 05 Seconds

1- Immediate On
2- Immediate Off
3- Immediate Reboot
4- Delayed On
5- Delayed Off
6- Sequenced Reboot
7- Delayed Reboot
8- Delayed Sequenced Reboot
9- Cancel Pending Commands

?- Help, <ESC>- Back, <ENTER>- Refresh, <CTRL-L>- Event Log
> hit e sc key

------- Device Manager --------------------------------------------------------

1- Router 1 ON
2- Router 2 ON
3- Router 3 ON
4- Router 4 ON
5- Router 5 ON
6- Router 6 ON
7- Router 7 ON
8- Router 8 ON
9- ALL Accessible Outlets

<ESC>- Back, <ENTER>- Refresh, <CTRL-L>- Event Log
> hit esc key again

------- Control Console -------------------------------------------------------

1- Device Manager
2- Network
3- System
4- Logout

?- Help, <ESC>- Main Menu, <ENTER>- Re fresh, <CTRL-L>- Event Log
> 4
You are now in passthru mode.

Now type "Ctrl Shift 6" then "x" to get back to the terminal server

ccie4u_term> type "disconnect" ;

Closing connection to power [confirm] press enter
ccie4u_term>

________________________________________________________________________________________

Once you have finished your scheduled rack rental time please perform a write erase then turn all the devices back off using these previous procedures - use option 5 (off) versus 4 (on) for controlling all outlets. Alternatively if someone immediately follows you on the schedule then after the write erase and deleting the vl an.dat file on the switches, issue a reload and leave the equipment powered on.

Be sure to wait about 2 minutes after you have powered up or rebooted a router before trying t o telnet to it so that it has a chance to load the operating system and initialize the interfaces.


 
© 2003 - 2015 CCIE4u.com All Rights Reserved    |    Disclaimer
Email: support@CCIE4u.com    |    Tel: (703) 585-0906